News & Press Releases
-
London, April 19, 2018
Primetals Technologies and ITR sign cooperation agreement on predictive maintenance solutions
Primetals Technologies and Industrial Technology Research (ITR), headquartered in Bethlehem, Pennsylvania, USA have signed an exclusive cooperation agreement covering the application of predictive maintenance solutions in steel related industries worldwide.
more
-
London, April 05, 2018
Hyundai issues final acceptance certificates for two long-rolling mills supplied by Primetals Technologies
Korean steel maker Hyundai Steel issued the final acceptance certificates (FACs) for two long rolling mills supplied by Primetals Technologies to the Dangjin special steel production facility.
more
-
London, April 03, 2018
Henan Yaxin orders two EAF Quantum electric arc furnaces from Primetals Technologies
The Chinese steel producer Henan Yaxin Steel Group Co., Ltd. (Henan Yaxin) has placed an order at Primetals Technologies for two EAF Quantum electric arc furnaces with a tapping weight of maximum 120 metric tons each.
more
-
London, March 29, 2018
Continuous caster modified by Primetals Technologies starts up at Gerdau Cartersville in the USA
In January, a continuous casting machine modified by Primetals Technologies was started up at the Gerdau steel making facility in Cartersville, Georgia, USA.
more
-
London, March 27, 2018
Primetals Technologies to supply EAF Quantum electric arc furnace and ladle furnace to Guilin Pinggang
Guilin Pinggang Iron and Steel Co., Ltd. (Guilin Pingang), a Chinese steel producer, has awarded Primetals Technologies an order to supply an EAF Quantum electric arc furnace with a tapping weight of 120 metric tons and a 120 metric ton twin ladle furnace.
more